About company

Our scope of operations:

Water treatment technology

Closed systems (ZLD)

Wastewater treatment

Our goal:

Development and implementation of most cost-effective and efficient solutions

Ion Exchange Technologies

AO Ion Exchange Technologies specializes in developing comprehensive solutions for water treatment of any quality for industrial and municipal consumption, as well as purification of wastewater of any complexity.

4 000 000 000

annual revenue turnover, RUB

21

duration of successful operation

200+

projects completed

1200

production areas, m2

200+

qualified employees

21

duration of successful operation

200+

projects completed

1200

production areas, m2

200+

qualified employees

Copy link

Ethane-containing Gas Processing Complex Water Intake Construction Progress for in Ust-Luga

Construction is underway on the banks of the Luga River in Kingisepp District of the Leningrad Region, right across from the village of Bolshoye Kuzemkino. The project in progress is a major construction endeavor, known as the “Gas Chemical Complex as part of the Ethane-containing Gas Processing Complex. External Infrastructure Facilities. River Luga Water Intake with Pipeline.” This facility is set to provide the Gas Chemical Complex within the Ethane-containing Gas Processing Complex with water sourced from the River Luga. This water supply will serve various needs, including household, drinking, fire-fighting, and industrial purposes.

The planned water intake volume is 143,600 m3 per day.

The water intake complex includes the construction of the following main structures – a water intake bucket with water intake headers, Pump Station I lifting building, as well as the laying of two pipelines from Pump Station I lifting building to the boundary of the Gas Chemical Complex’s design. The water intake headers are equipped with fish protection devices to prevent harm to the aquatic fauna.

The project documentation for the construction object has been developed in accordance with the requirements of Government of the Russian Federation decree of February 16, 2008, No. 87, “On the Composition of Sections of Project Documentation and Requirements to their Content.”

The non-governmental expert assessment of the project documentation by OOO “MIC-Expertise” NGE No. 47-2-1-3-038288-2021 of July 15, 2021 was positive, and one from from the Federal Service for Supervision of Natural Resource Use No. 740/GEhEh of June 25, 2021 was positive as well.

Limited Liability Company “Baltic Chemical Complex” has obtained construction permit No. 47-RU47507308-091K-2021 valid from August 20, 2021, through August 20, 2025.

To ensure construction and installation work is conducted in compliance with the norms and requirements of Russia’s environmental legislation, approvals from executive authorities have also been obtained, including the Northwest Territorial Department of the Federal Agency for Fishery, Neva-Ladoga Basin Water Directorate, the Committee on Natural Resources of the Leningrad Region, and the Rospotrebnadzor Office for Leningrad Region.

The materials for the environmental impact assessment underwent public discussion involving representatives of the local population. During these public hearings, the feasibility of project implementation was justified, with the planned activities’ impact on key eco-social factors taken into consideration.

During the construction and installation work, the project incorporates and carries out measures to protect and preserve all components of the surrounding natural environment – land resources, water resources, aquatic biological resources, atmospheric air, and subsoil.

To ensure compliance with environmental protection measures during business or other activities, rational utilization and restoration of natural resources, as well as adherence to environmental protection requirements stipulated by environmental legislation, quarterly industrial environmental control and monitoring of environmental components are conducted, involving the engagement of specialists from accredited laboratories.

During monitoring, samples of river and groundwater, atmospheric air, soil, as well as monitoring of plant and animal life are collected at points established by the monitoring program.

In the spring spawning periods of 2022 and 2023, near the village of Ostrovki in Vsevolozhsk District of the Leningrad Region, under the supervision of specialists from the Northwest Branch of the Federal State Budgetary Institution “Glavrybvod” and the Fishery Directorate, a series of releases of young Atlantic salmon yearling with an average individual weight of 11-20 grams were carried out. These were bred in the facilities of the Federal State Budgetary Institution “Neva Fish Farm.” Approximately 19,500 salmon fry were introduced into the fauna of the Neva River as part of compensatory measures aimed at restoring bio resources during the implementation of the project “Gas Chemical Complex as part of the Ethane-containing Gas Processing Complex. External Infrastructure Facilities. River Luga Water Intake with Pipeline.”

The purpose of these compensatory measures is to conserve aquatic biological resources and their habitat by preventing, reducing, and eliminating the negative consequences of anthropogenic activities.

Currently, construction activities at the site have seen the completion of tasks like installing the water intake bucket, as well as planning the shoreline slopes with stone reinforcement. Ongoing efforts encompass the construction of Pump Station I lifting building and administrative spaces, alongside the installation of pipelines for the linear section. This includes backfilling the pipeline trench. Intermediate hydrotests of the pipelines have been successfully conducted. Furthermore, work is underway to lay external water supply and sewage networks, as well as cable routing for powering the water supply networks. Initial steps towards improving the site’s surroundings have also been taken.

 

#БХК #BCC

Copy link

Release of juvenile Atlantic yearling salmon stock

On April 13, 2023, near the village of Ostrovki, Vsevolozhsk District, Leningrad Region, yearling Atlantic salmon with an average piece weight of 11-20 grams were released under the control of specialists from the North-Western Branch of the Federal State Budgetary Institution Glavrybvod and SZU FAR (Rosrybolovstvo). Fish fry were grown in the nursery ponds of FGBU “Nevsky Fish Breeding Plant”.
Atlantic salmon totaling to 2,691 fry (weighing about 970 kg) replenished the fauna of the Neva River in the course of compensatory arrangements to restore biological resources during the implementation of the Project referred to as “Gas Chemical Complex within the Configuration of the Ethane-Containing Gas Processing Complex Project. Offsite Infrastructure Facilities. Water Intake from the Luga River with a Water Conduit”. The event was initiated by AO Ion Exchange Technologies.
The purpose of implemented compensatory arrangements was to preserve aquatic biological resources and their habitats by means of prevention, reduction, and elimination of the consequences of anthropogenic impacts on the environment.

#BCC

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Выпуск молоди атлантического лосося-годовика

Copy link

Norilsk Wastewater Treatment Plant Begins Operating

Norilsk Wastewater Treatment Plant Begins Operating by Incorporating Industrial Wastewater Treatment Facilities from AO Ion Exchange Technologies

The facilities are designed to purify suspended solids, petroleum products, metals, and other harmful impurities using the physicochemical treatment method. Reagent treatment of water with final disinfection using ultraviolet lamps is the basis of the method, and it has universal applicability in many sectors of the national economy.

Although local wastewater treatment facilities have a uniform system for purifying industrial effluents utilizing reagents, they differ in their capacity.

  #NORILSK. “Taimyr Telegraph”

Copy link

International Conference “Tunisia 2020”

Today, on November 29, a delegation from AO Ion Exchange Technologies arrived in Tunisia to attend the International Conference in support of Tunisia’s economic, social, and sustainable development until 2020.

The conference brought together more than 1,000 government leaders, heads of state, financial institution presidents, investment funds, and heads of major international companies from 70 countries.

Over 140 investment projects aimed at developing Tunisia’s economy will be presented at the conference. Discussions on the rehabilitation, expansion, and strengthening of the sewage network and the national water supply and distribution company will be some of the main topics, in which AO Ion Exchange Technologies will actively participate.

As part of the conference, the main development plan for Tunisia until 2020 will be presented, including the most extensive projects and reforms that will give an impetus to economic development and attract domestic and foreign investment.

Yuriy Anatolyevich Kopytin, Natalya Yuryevna Samsonova, Svetlana Petrovna Samsonova, Elena Mikhailovna Meshcheryakova, and Maria Vladimirovna Moreva are attending the conference.

Copy link

Commencement of Public Discussions on Project Documentation

OOO Baltic Chemical Complex has announced that it will be seeking public discussions on the project documentation developed by AO “Ion Exchange Technologies.”

OOO Baltic Chemical Complex has informed about the initiation of an environmental impact assessment procedure while preparing documentation that outlines its commercial activities. Additionally, it has commenced public discussions on project documentation at the notification, preliminary environmental impact assessment, and TOR formation stage for Environmental Impact Assessment on the object: “Gas Chemical Complex as part of the complex for processing ethane-containing gas. External infrastructure facilities. Water intake from the Luga river with a water pipe.”

The estimated timeline for conducting the environmental impact assessment is Q3-Q4 2020.

#BCC

Copy link

New Environmental Tax

Experts in the field of water treatment, water purification, and wastewater treatment at the company Ion Exchange Technologies have expressed their opinion about the possible introduction of a new environmental tax.

“In my opinion, the Ministry of Finance’s draft law is not the best, as there is no need for it, since the Federal Law “On the Protection of the Environment” (OPE), which began to operate from 01.01.2019, already contains the necessary amendments. It provides for the gradation of enterprises according to emissions, discharges of harmful substances, and waste into the environment. Each category provides for its tariff for the payment of environmental pollution, in other words, enterprises of the 1st category (for example, oil refineries) pay more than enterprises of the 4th category (food industry enterprises). According to this law, the fee for small and medium-sized businesses is proportional to the annual turnover of the enterprises. However, the environmental tax does not take this into account, which means that oil refining and food industry enterprises will pay the same amount for the same type of pollution, which will lead to the decline of the food industry, as large amounts of taxes will lead to bankruptcy. Furthermore, the law on environmental protection provides for the stimulation of enterprises up to the cancellation of the fee for waste disposal, atmospheric emissions, and discharge into water bodies, provided that environmental protection measures are carried out in accordance with the “Best Available Technologies” reference book. In case of non-compliance, the fees increase by 100 times.

The environmental tax does not provide for this, and the TOP-100 Russian enterprises will find it more profitable to pay the tax rather than upgrade their environmental facilities. It is necessary to refine the law on environmental protection and make certain amendments, for example, to specify the deadlines for upgrades according to the categories of enterprises,”

-comments Fail Nasyrov, the chief specialist in wastewater treatment at AO Ion Exchange Technologies.

Svetlana Samsonova, the technical director of AO Ion Exchange Technologies, expressed her position regarding the environmental tax discussion:

“The main goal should not only be a fair collection of tax revenues for environmental protection, but also the organization of funding for natural events. Unlike the already existing tax, the new tax seems more liberal towards producers of goods, which allows them to care less about upgrading their own wastewater treatment technologies discharged into the natural reservoirs. We need to avoid an ecological catastrophe and give our children a clean, healthy planet.”

Read more

Our solutions

Mechanical water treatment:

  • Clarification
  • Sedimentation
  • Pressure/non-pressure filtration
  • Ultra-/microfiltration

Physical-chemical water treatment:

  • Pressure/non-pressure flotation
  • Oil separators
  • Reagent treatment

Biological water treatment:

  • Aerotank
  • MBR
  • MBBR

Desalination water treatment:

  • Reverse osmosis
  • Ion exchange
  • Electrodialysis
  • Electrodeionization

Disposal:

  • Concentration evaporation
  • Sludge drying
  • Sludge incineration

Dehydration water treatment:

  • Press filters
  • Decanter centrifuge
  • Screw dehydrators

Our services

Design development and survey work

Design development and survey work

  • Engineering surveys
  • Development of design documentation
  • Development of detailed design documentation
  • Construction supervision (Author’s supervision)
  • Support in the expertise and approval of the design documentation
  • Development of a technical and economic substantiation of construction
  • Consulting services on design and construction

Equipment production

Equipment production

  • Our own production facility (1,200 m2 of indoor space)
  • Over 200 specialized engineers and technicians
  • Quality control

Pilot-scale test

Pilot-scale test

  • Our own park of pilot installations that enable us to fine-tune and perfect every technology
  • Our own mobile analytical laboratory

Construction and installation work

Construction and installation work

  • Self-regulatory organization for construction and installation works up to RUB 10 B

Usage of water treatment equipment

Usage of water treatment equipment

Our production

Read more

Our projects

OAO “SPbAtomEnergoProject”

OAO “SPbAtomEnergoProject”

Development of working documentation for a water treatment unit to supply splash pools, firewater tanks, and the first and second circuits of the NPP-2006 at the LNPP-2 site.

Read more

ОАО «СПбАтомэнергопроект»

ОАО «СПбАтомэнергопроект»

Разработка рабочей документации водоподготовительной установки для подпитки брызгальных бассейнов, баков противопожарного запаса воды, первого и второго контуров АЭС-2006 на площадке ЛАЭС-2

Read more

OAO “AGC Borsky Glass Plant”

OAO “AGC Borsky Glass Plant”

Project work and development of technical documentation for connecting technological equipment to existing treatment facilities.

Read more

OAO “AGC Borsky Glass Plant”

OAO “AGC Borsky Glass Plant”

Turnkey supply of equipment for a flotation wastewater treatment unit. Capacity – 250 m3/hour.

Read more

OOO “Druzhba-Monolit”

OOO “Druzhba-Monolit”

Turnkey development of project documentation and supply of technological equipment for a deironing plant. Capacity – 3,000 m3/day.

Read more

OAO “Ural Tube Plant Uraltrubprom”

OAO “Ural Tube Plant Uraltrubprom”

A turnkey system for preparation, purification, and disposal of cutting fluids (CO2).

Read more

OAO “Vyksunsky Metallurgical Plant”

OAO “Vyksunsky Metallurgical Plant”

Turnkey construction of a complex for treating and processing emulsion effluents for TESC-3. Capacity: 1 – 320 m3/hour 2 – 180 m3/hour

Read more

OAO “Vyksunsky Metallurgical Plant”

OAO “Vyksunsky Metallurgical Plant”

Turnkey construction of wastewater treatment facilities at water outlet No. 5. Capacity – 14,400 m3/day.

Read more

MU “Zakazchik” of the Pioneer City District

MU “Zakazchik” of the Pioneer City District

Development of design and estimate documentation for the facility: “Construction of a pumping station for the second rise of water supply with a deferrization station” Capacity – 5,000 m3/day.

Read more

Branch of OAO “RusHydro” – “Kamskaya Hydroelectric Power Station”

Branch of OAO “RusHydro” – “Kamskaya Hydroelectric Power Station”

Turnkey replacement of deep and drainage pump units, pipeline shut-off fittings in the dewatering pump systems of the flow part of the hydro units.

Read more

OAO “Cherepovets Azot”

OAO “Cherepovets Azot”

Development of working and project documentation for the “Modernization of the water softening and partially desalinated water unit in Building 308 of Ammonia Production Workshop No. 1.” Capacity – 345...

Read more

OAO “Novomoskovsk Joint Stock Company “Azot”

OAO “Novomoskovsk Joint Stock Company “Azot”

Development of technical documentation and commissioning of the UPCORE technology for counterflow regeneration in the water demineralization unit of the Ammonia-4 workshop. Capacity – 200 m3/hour.

Read more

OAO “Novomoskovsk Joint Stock Company “Azot”

OAO “Novomoskovsk Joint Stock Company “Azot”

Turnkey technical re-equipment of the third line of the water demineralization unit in the Ammonia-4 workshop, with a capacity of 200 m3/hour.

Read more

OAO “Moscow Coke Gas Plant”

OAO “Moscow Coke Gas Plant”

Development of project cost estimation documentation for industrial wastewater treatment facilities at water outlet No. 1. Capacity – 17 m3/day.

Read more

Federal State Unitary Enterprise “Production Association Plant Named After Sergo”

Federal State Unitary Enterprise “Production Association Plant Named After Sergo”

Supply of chemical water purification installation

Read more

Municipal Institution “City Construction Client”

Municipal Institution “City Construction Client”

Project work for adjustments to the working project “Reconstruction of water treatment facilities in Veliky Ustyug, Vologda Region.” Capacity – 350 m3/hour.

Read more

OAO Nizhny Novgorod Engineering Company “Atomenergoproject” (OAO “NIAEP”)

OAO Nizhny Novgorod Engineering Company “Atomenergoproject” (OAO “NIAEP”)

Supply of furniture, laboratory equipment, and VHL instruments for the first and second circuits of the construction of the 2nd power unit of the Rostov NPP.

Read more

Municipal Enterprise “Client” of Pioneer Urban District

Municipal Enterprise “Client” of Pioneer Urban District

Development of project cost estimation documentation for the project: “Construction of the second lift pumping station for water supply with deironing plant.” Capacity – 5,000 m3/day.

Read more

OAO “Zavolzhsky Motor Plant”

OAO “Zavolzhsky Motor Plant”

Project work for the “Complex of facilities for further treatment of wastewater from the Zavolzhye city biological water treatment plant to meet the TLV requirements of the fishery water body.

Read more

OAO “Nizhnekamskshina”

OAO “Nizhnekamskshina”

Development of project documentation for the “Water preparation station with a capacity of 250 m3/hour.”

Read more

OAO “SamaraNeftekhimProject”

OAO “SamaraNeftekhimProject”

Hydrocracking complex at OAO “ANPZ VNK” for the project “Reconstruction of chemical water treatment Tit. 1296 (chemical water preparation section) with increased capacity. Construction of the desalination chemical water purification...

Read more

OAO “Chelyabinsk Pipe Rolling Plant”

OAO “Chelyabinsk Pipe Rolling Plant”

Project work for the “Closed water use system of the enterprise with the construction of treatment facilities for industrial, storm, and acidic effluents.” Capacity – 700 m3/hour

Read more

OAO “SamaraNeftekhimProject”

OAO “SamaraNeftekhimProject”

Hydrocracking complex at OAO “ANPZ VNK” for the project “Hydrocracking complex UI&O with a technical water supply pump station at the plant with a river water treatment unit.” Capacity –...

Read more

Branch of OAO “RusHydro” – “Novosibirsk Hydroelectric Power Station”

Branch of OAO “RusHydro” – “Novosibirsk Hydroelectric Power Station”

Turnkey construction of surface runoff treatment facilities for the first phase.

Read more

OOO “Ural Water Channel Project Management Company”

OOO “Ural Water Channel Project Management Company”

Construction of drinking water supply in Zarichny from the Ust-Kamyshensky underground water intake. Drinking water preparation station with a capacity of 5,600 m3/day. Project documentation. Technological section.

Read more

OOO “Kursk Technoconstruction”

OOO “Kursk Technoconstruction”

Supply of equipment for the water deironing plant at the Kyiv water intake site. Capacity – 90,000 m3/day

Read more

OAO “Cherepovets “Azot”

OAO “Cherepovets “Azot”

Turnkey comprehensive equipment for the “Pre-treatment unit for industrial and river wastewater in Building 345/1 of Ammonia Production Workshop No. 2. Capacity – 410,511 m3/hour

Read more

Municipal Unitary Enterprise “Water Supply and Sewerage System” of the Municipal Formation “Roslavlsky District”

Municipal Unitary Enterprise “Water Supply and Sewerage System” of the Municipal Formation “Roslavlsky District”

Design of a drinking water preparation station at the “Dubinin Lug” water supply system with a capacity of 22,000 m3/day in Roslavlsk, Smolensk Region.

Read more

OOO “RN-Sakhalinmorneftegaz”

OOO “RN-Sakhalinmorneftegaz”

A turnkey complex of technological equipment for equipping wastewater treatment facilities at the “Central Okha” and “Katangli” fields. Capacity – 2,000 m3/hour Capacity of each system – 300 m3/hour

Read more

Municipal Enterprise of the city of Pskov “City Water Company”

Municipal Enterprise of the city of Pskov “City Water Company”

Reconstruction of water supply and wastewater networks and facilities in the city of Pskov. Capacity – 78,000 m3/day.

Read more

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Station”

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Station”

Turnkey complex of technological equipment for wastewater treatment. Capacity – 50 m3/hour

Read more

ZAO “Construction Management No. 1”

ZAO “Construction Management No. 1”

Stormwater sewage treatment facilities for the project: “Reconstruction (restoration) of the runway pavements of Murmansk airport in Murmansk Region.” Capacity: 40m3/h – TF No. 1, 50m3/h – TF No. 2.

Read more

OAO “Cherepovets “Azot”

OAO “Cherepovets “Azot”

Supply of pipeline fittings.

Read more

OAO “Lebedinsky Mining and Processing Plant”

OAO “Lebedinsky Mining and Processing Plant”

Development of a potential method for water preparation and options for its implementation when discharging water into the Oskolets River, 4 shafts of the Drainage Shaft. OAO “Lebedinsky GOK”

Read more

OAO “SamaraNeftekhimProject”

OAO “SamaraNeftekhimProject”

Development of project documentation for the “Hydrocracking Complex. Water Preparation Unit. Steam Condensate Purification Section” for OAO “Novokuibyshevsk Oil Refinery.” Capacity – 1,150 m3/hour

Read more

OOO “Balakovskie Mineral Fertilizers”

OOO “Balakovskie Mineral Fertilizers”

Development of project documentation for the technical upgrade of the air supply system for compressed air through decentralization in production and consumption systems

Read more

OAO “Krasctvetmet”

OAO “Krasctvetmet”

Turnkey reverse osmosis system with a water treatment unit. Capacity: Reverse osmosis system – 10 m3/hour; Water treatment unit – 5 m3/hour.

Read more

OAO “EVRAZ ZSMK”

OAO “EVRAZ ZSMK”

Development of project cost estimation documentation for the “Construction of wastewater treatment facilities at the rail production site.”

Read more

ZAO “Izhorsky Pipe Plant”

ZAO “Izhorsky Pipe Plant”

Turnkey supply of a cutting fluid disposal complex. Capacity – 4.7 m3/hour

Read more

ZAO “RegionSnab”

ZAO “RegionSnab”

Turnkey complex of works for the construction of a demineralized water preparation unit for OOO “Novokuibyshevsk Oil and Additives Plant.” Capacity – 43 m3/hour

Read more

SAKHALIN ENERGY INVESTMENT COMPANY LTD

SAKHALIN ENERGY INVESTMENT COMPANY LTD

Development of project-technical documentation for water treatment facilities at the Combined Onshore Processing Facility (COPF).

Read more

OAO “SamaraNeftekhimProject”

OAO “SamaraNeftekhimProject”

Development of project documentation for the “Hydrocracking Complex Installation. Local Recycling Water Units” for OAO “Novokuibyshevsk Oil Refinery.” Capacity – 750 m3/hour

Read more

OAO “Achinsk Oil Refinery of Vostokneftezavod Company” (OAO ANPZ VNK)

OAO “Achinsk Oil Refinery of Vostokneftezavod Company” (OAO ANPZ VNK)

Lightened water filtration unit.

Read more

OAO “All-Russian Research Institute for Nuclear Power Plant Operation” (OAO “VNIIAES”)

OAO “All-Russian Research Institute for Nuclear Power Plant Operation” (OAO “VNIIAES”)

Development of project and working documentation for the reconstruction of the Smolensk Nuclear Power Plant CWT. Capacity – 100 m3/hour.

Read more

OOO “Balakovskie Mineral Fertilizers”

OOO “Balakovskie Mineral Fertilizers”

Technical re-equipment of the compressed air supply system at the production facility through the decentralization of the production and consumption systems Compressor performance: For Industrial Filtration Unit (IFU), CMS-2, CNOSVIV...

Read more

OAO “EVRAZ Nizhny Tagil Metallurgical Plant”

OAO “EVRAZ Nizhny Tagil Metallurgical Plant”

Survey of the water supply system, domestic and industrial wastewater systems of OAO “EVRAZ NTMK” for closed water supply system design

Read more

OAO “All-Russian Scientific Research Institute for Nuclear Power Plant Operation” (OAO “VNIIAES”)

OAO “All-Russian Scientific Research Institute for Nuclear Power Plant Operation” (OAO “VNIIAES”)

Development of project and working documentation for the reconstruction of the CWT at Kursk Nuclear Power Plant

Read more

OOO “Tatneft-Neftikhimsnab”

OOO “Tatneft-Neftikhimsnab”

Supply of a water treatment station with a capacity of 250 m3/hour

Read more

OOO “Scientific-Production Association “Saint-Petersburg Electrical Engineering Company”

OOO “Scientific-Production Association “Saint-Petersburg Electrical Engineering Company”

Design, manufacturing, supply, construction and installation, commissioning, and personnel training for “Water Treatment Facilities” at the construction of the “Diamond Mining Complex on the Lomonosov Diamond Deposit. Start-up Complex with...

Read more

Branch of OAO “TGK-16” – Nizhnekamsk Thermal Power Plant (PTK-1)

Branch of OAO “TGK-16” – Nizhnekamsk Thermal Power Plant (PTK-1)

Technical re-equipment of the chemical desalination unit with increased productivity to 1,600 tons/hour for desalinated water

Read more

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

Manufacturing and supply of desalination unit for spray basin feedwater. Capacity – 35 m3/hour.

Read more

Committee of Urban Planning of the Administration of Narofominsky Municipal District

Committee of Urban Planning of the Administration of Narofominsky Municipal District

Construction of a water deironing plant with a capacity of 18,000 m3/day at water supply system No. 10 in Narofominsk, Moscow Region.

Read more

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

Supply, installation, and commissioning of a wastewater treatment unit. Capacity – 300 m3/day.

Read more

OAO “Middle Ural Copper Smelting Plant”

OAO “Middle Ural Copper Smelting Plant”

Supply of equipment for the mechanical wastewater treatment installation

Read more

Municipal State-Funded Institution of the city district “City of Yuzhno-Sakhalinsk” Capital Construction Management”

Municipal State-Funded Institution of the city district “City of Yuzhno-Sakhalinsk” Capital Construction Management”

Correction of the project: “Reconstruction of wastewater treatment facilities OSK-7 in Yuzhno-Sakhalinsk”

Read more

OAO “Eastern European Main Scientific Research and Design Institute of Energy Technologies” (OAO “Main Institute “VNIIET”)

OAO “Eastern European Main Scientific Research and Design Institute of Energy Technologies” (OAO “Main Institute “VNIIET”)

Development and introduction of changes in the working and estimate documentation for the objects of the 1st stage of the construction of LNPP-2 Capacity – 400 m3/h.

Read more

OOO Sakhalin Company “EnergoStroy”

OOO Sakhalin Company “EnergoStroy”

Complex technological equipment for the reconstruction and construction of communal infrastructure facilities (Reconstruction of Wastewater Treatment Plant OSK-7 in Yuzhno-Sakhalinsk) Capacity – 90,000 m3/day.

Read more

OAO “PhosAgro – Cherepovets”

OAO “PhosAgro – Cherepovets”

Pre-project work research for performing a long-term water balance calculation for the Nitrogen Complex of OAO “PhosAgro – Cherepovets”

Read more

OOO “Novokuibyshevsk Plant of Oils and Additives”

OOO “Novokuibyshevsk Plant of Oils and Additives”

Reagent dosing units maintaining the required quality of boiler water in the hydrogen production unit of the hydroprocessing complex and the electro-deionization unit of OOO “Novokuibyshevsk Plant of Oils and...

Read more

OAO “Novokuibyshevsk Refinery” (OAO “NK NPZ”)

OAO “Novokuibyshevsk Refinery” (OAO “NK NPZ”)

Installation of preliminary purification for the recirculation systems 1a and 2a. Capacity – 10 m3/h.

Read more

OOO “Industrial Group “Phosphorite”

OOO “Industrial Group “Phosphorite”

Conducting pilot tests for wastewater treatment, obtaining initial data for the development of a project for the reconstruction of wastewater treatment facilities of OOO “IG “Phosphorite” Capacity – 5 m3/h.

Read more

OAO “EVRAZ United Western Siberian Metallurgical Plant”

OAO “EVRAZ United Western Siberian Metallurgical Plant”

Development of Technical and Economic Justification for the design of water decontamination units for the GSZHU system, construction site of OAO “EVRAZ ZSMK”. Capacity – 1,150 m3/h.

Read more

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

OAO “Concern Rosenergoatom” – “Balakovskaya Nuclear Power Plant”

“Under load” commissioning works for the event “Ensuring the chemistry conditions of the spray pools (A-group technical water). Installation of desalination for feeding water to the spray pools. Capacity –...

Read more

OAO “TGK-16”

OAO “TGK-16”

Condensate purification equipment. Technical upgrade of the reception scheme and the installation of condensate desalination for CWT-1 (1 starting complex). Capacity – 600 m3/h.

Read more

ZAO “BalakovoVolgoEnergoMontazh”

ZAO “BalakovoVolgoEnergoMontazh”

Supply of pipeline fittings.

Read more

OAO “Tulagorvodokanal”

OAO “Tulagorvodokanal”

Supply, installation and commissioning of a comprehensive biogas incineration unit for the project “Design and construction, expansion of city sewage treatment plants to a capacity of 320,000 m3/day.”

Read more

OAO “Tatneft” named after V.D. Shashin

OAO “Tatneft” named after V.D. Shashin

Design, construction and installation, commissioning works and personnel training with supply of materials and equipment for three facilities for preparation of associated-produced water with highly viscous oil Capacity – 1,900...

Read more

OAO “PhosAgro-Cherepovets”

OAO “PhosAgro-Cherepovets”

Inspection of wastewater at OAO “PhosAgro-Cherepovets” Nitrogen Complex within the project “Construction of a 2200-ton a day ammonia production plant” Capacity – 30,000 m3/day.

Read more

OAO “Tulagorvodokanal”

OAO “Tulagorvodokanal”

Design and construction, expansion of city sewage treatment plants to a capacity of 320,000 m3/day (development of project and working documentation).

Read more

OAO “Kuibyshev Oil Refinery” (OAO “KNPZ”)

OAO “Kuibyshev Oil Refinery” (OAO “KNPZ”)

Deminerallized water preparation unit. Capacity – 93 m3/h.

Read more

OAO “PhosAgro – Cherepovets”

OAO “PhosAgro – Cherepovets”

Technical upgrade of water supply systems in buildings 345/1 and 345/2 to ensure the expansion of production of OAO “PhosAgro-Cherepovets” Nitrogen Complex and transition to river water of different quality...

Read more

OAO Khibinskaya Teplovaya Kompaniya

OAO Khibinskaya Teplovaya Kompaniya

Supply of “turnkey” equipment for disinfection of network water for the heating system of Kirovsk city. System volume – 18,000 m3

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Development of working documentation and execution of technical re-equipment works for the sludge dewatering unit with pumping stations in building 836 of the water treatment department of the AM-2 shop....

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Development of working documentation and implementation of a project for technical re-equipment of the wastewater neutralization unit for the water treatment department of the AM-2 shop. Capacity – 100 m3/hour

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Replacement of membrane elements in reverse osmosis units of the chemical water treatment section of OAO PhosAgro-Cherepovets TPP

Read more

OAO Tatneft

OAO Tatneft

Construction and installation work for a preparation unit for associated petroleum gas water with highly viscous oil. Capacity – 1,900 m3/hour: Capacity of 3 systems: 720 m3/hour, 350 m3/hour, 850...

Read more

OOO LUKOIL-Energoengineering

OOO LUKOIL-Energoengineering

Implementation of an electro-deionization unit at the WTP PGU-110. Capacity – 110 m3/hour

Read more

OAO NGK Slavneft

OAO NGK Slavneft

8” Aquaflex membrane module (catalyst)

Read more

OAO Yaroslavl Vodokanal

OAO Yaroslavl Vodokanal

Supply of mechanical coarse rake screens in stainless steel execution

Read more

OAO Concern Rosenergoatom – Balakovo Nuclear Power Plant

OAO Concern Rosenergoatom – Balakovo Nuclear Power Plant

Commissioning works “under load” of the biological treatment plant equipment. Capacity – 300 m3/day

Read more

OOO SIBUR-Kstovo

OOO SIBUR-Kstovo

Design work: “Reconstruction of industrial wastewater treatment system”. Capacity – 470 m3/hour

Read more

OAO Concern Rosenergoatom – Balakovo Nuclear Power Plant

OAO Concern Rosenergoatom – Balakovo Nuclear Power Plant

Supply of filtering elements

Read more

OOO Tomskneftekhim

OOO Tomskneftekhim

Development of project cost documentation (stage “project documentation”) of the project “Construction of local wastewater treatment facilities of OOO Tomskneftekhim”. Capacity – 75 m3/hour

Read more

MUP Vodokanal of Votkinsk city

MUP Vodokanal of Votkinsk city

Supply of aerators

Read more

OOO Chemoproject I-PI-C

OOO Chemoproject I-PI-C

Design, procurement and construction of a water treatment and sewage treatment plant (IOT) on a “turnkey” basis. Capacity – 180 m3/hour

Read more

AO Apatit

AO Apatit

Technical re-equipment of the MKS-1 with the installation of compressor ZN630±7 with ND2000W dryer, STe830-40 cooling towers, WPS116 water stations (2 pcs) in the section of the steam and gas...

Read more

OOO West Siberian Oil Chemical Refinery

OOO West Siberian Oil Chemical Refinery

Supply of equipment for river water treatment unit on a turnkey basis. Capacity – 250 m3/hour

Read more

MUP Gorvodokanal

MUP Gorvodokanal

Supply of equipment for “Sludge thickening line”. Capacity – 500 m3/day

Read more

MUP Gorvodokanal

MUP Gorvodokanal

Supply of equipment for “Mechanical dewatering line of thickened sludge”. Capacity – 10 m3/hour.

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Replacement of membrane elements in reverse osmosis units of the chemical water treatment section of OAO PhosAgro-Cherepovets TPP

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Technical re-equipment of the wastewater neutralization unit in building No. 123, KTP-53, water treatment department of the AM-2 section

Read more

PAO Norilsk Nickel Mining and Metallurgical Company

PAO Norilsk Nickel Mining and Metallurgical Company

Development of technology for additional treatment of mine water at the “Izvestnyakov” mine of the Kayerkan mine.

Read more

AO Apatit

AO Apatit

Technical re-equipment of the air supply unit according to the TPU (PEFK) with the installation of a screw compressor GA110FF-8.5 (development of project cost documentation, supply, construction and installation works).

Read more

AO Apatit

AO Apatit

Repair of the water treatment plants CWT-1 and CWT-2.

Read more

PAO Tatneft

PAO Tatneft

Supply of chemical products.

Read more

AO Segezhsky CBK

AO Segezhsky CBK

Development of pre-project documentation for the project “Modernization of CWT Unit of TPP-1”.

Read more

AO Segezhsky CBK

AO Segezhsky CBK

Conducting pilot tests to determine the technology for preparing chemically purified water for energy boilers as part of the project “Modernization of CWT Unit of TPP-1”

Read more

OOO Tomskneftekhim

OOO Tomskneftekhim

Development of working documentation for the construction of local treatment facilities for OOO “Tomskneftekhim”, author’s supervision over the construction. Capacity – 75 m3/hour

Read more

OAO ILIM Group

OAO ILIM Group

Supply of equipment for the preparation of chemically desalted water with a capacity of 400 m3/hour on a “turnkey” basis

Read more

OAO PhosAgro-Cherepovets

OAO PhosAgro-Cherepovets

Pre-project survey and development of basic technical solutions with the issuance of a technical report on the object “Reconstruction of the water supply and drainage scheme of the Phosphorus complex...

Read more

OOO RVC-Consulting

OOO RVC-Consulting

Preparation of the technical part of the proposal for concluding a concession agreement regarding the centralized cold water supply and sewage systems located in the city of Arkhangelsk, owned by...

Read more

AO Apatit

AO Apatit

Design and construction of a new water circulation system in the SKP (SK-17) BF of AO Apatit. Capacity – 6,000 m3/hour.

Read more

OAO ILIM Group

OAO ILIM Group

Basic equipment design for the supply of chemically desalted water with a capacity of 400 m3/hour.

Read more

PAO Chelyabinsk Zinc Plant

PAO Chelyabinsk Zinc Plant

Research work on the topic: “Development of technology for post-treatment of domestic and surface runoff wastewater with subsequent use in the water supply system of the Chelyabinsk Zinc Plant. Stage...

Read more

Federal State Budgetary Educational Institution of Higher Education National Research University MEI

Federal State Budgetary Educational Institution of Higher Education National Research University MEI

Experimental and design work on the topic: “Development of reagent-free water treatment technology for the needs of the hot water supply system of the Primorskaya State District Power Plant”.

Read more

OOO Peuru Rus

OOO Peuru Rus

Development of technical documentation as part of the FEEL2 investment application for the object: “Construction of a cardboard production facility in Ust-Ilimsk” at the Branch of AO Ilim Group in...

Read more

OOO Gazpromneft – Catalytic Systems

OOO Gazpromneft – Catalytic Systems

Supply of a local wastewater treatment plant U-601 (design, supply, construction, installation, and commissioning). Capacity – 178.20 m3/hour.

Read more

OOO Novokuibyshevsk Oil and Additives Plant

OOO Novokuibyshevsk Oil and Additives Plant

Supply of reagents and membrane units for UPV and RHC.

Read more

AO National Logistics Technologies

AO National Logistics Technologies

Construction of the object “Logistics Post Center in Khabarovsk” on a turnkey basis

Read more

PAO Tatneft

PAO Tatneft

Implementation of construction and installation work at the UPPDV-350 “Abdulovo” object according to production technology (TX) and automation of production technology (ATX) sections based on the block No. 1 sample...

Read more

OAO Research and Design Institute of Carbamide and Organic Synthesis Products

OAO Research and Design Institute of Carbamide and Organic Synthesis Products

Development of project documentation for the construction of the facility “Water Demineralization and Condensate Treatment Unit with a Capacity of 500,000 Tons/year for PAO NIZHNEKAMSKNEFTEKHIM, Nizhnekamsk

Read more

OOO RN-Drilling

OOO RN-Drilling

Supply of a plant for deep biochemical purification of domestic and industrial wastewater.

Read more

OOO Novokuibyshevsk Oil and Additives Plant

OOO Novokuibyshevsk Oil and Additives Plant

Supply of reagents and membrane units for UPV and RHC.

Read more

PAO Gai Gorno-Obogatitelny Combine

PAO Gai Gorno-Obogatitelny Combine

Construction of the first iteration of the object “Reverse Water Treatment Station” consisting of a block of treatment facilities, an above-ground pipe gallery, an underground pipe tunnel passageway, and a...

Read more

OOO MT Russia

OOO MT Russia

Supply of a water treatment plant (WTP) MR FY 178 Lot No. 1 – Installation for the production of demineralized water; Lot No. 2 – Installation for concentrate squeezing; Lot...

Read more

OOO Tomskneftekhim

OOO Tomskneftekhim

Supervision of construction and installation work, construction, technical re-equipment, and reconstruction on the object(s)

Read more

AO Atomstroyexport (AO ASE)

AO Atomstroyexport (AO ASE)

Supply of equipment for the construction of Block No. 1 of the Ruppur Nuclear Power Plant. Capacity – 750 m3/h

Read more

OOO NOVATEK-Ust-Luga

OOO NOVATEK-Ust-Luga

Water demineralization unit. Capacity of the desalination unit – 42 m3/h. Capacity of the evaporation unit – 6 m3/h

Read more

OOO China National Chemical Engineering Construction Corporation Seven

OOO China National Chemical Engineering Construction Corporation Seven

Execution of works for the development of project documentation for the object “Gas Chemical Complex as part of the Ethane-containing Gas Processing Complex. External infrastructure objects. Water intake from the...

Read more

AO Norilsk-Taimyr Energy Company

AO Norilsk-Taimyr Energy Company

A complex of works for material and technical supply and “turnkey” construction projects of capital construction: “UTVGS. Release No. 93. STP. LFT”, code UTVGS-93-LOS; “UTVGS. Release No. 94. STP. LFT”,...

Read more

AO Gazpromneft-ONPZ

AO Gazpromneft-ONPZ

Development of project and working documentation, and full author supervision for the “CWT plant.” Capacity of purified water – 620 m3/day

Read more

AO Apatit

AO Apatit

Flocculant Itflok M4135.

Read more

AO Electrosnabsbyt

AO Electrosnabsbyt

Supply of backwash filters for local wastewater treatment facilities at OOO Afipsky Refinery

Read more

OOO China National Chemical Engineering Construction Corporation Seven

OOO China National Chemical Engineering Construction Corporation Seven

Execution of works for the development of working documentation and procurement of main technological equipment for the object “Title 16230 – Sewage treatment plants as part of the industrial infrastructure...

Read more

OOO China National Chemical Engineering Construction Corporation Seven

OOO China National Chemical Engineering Construction Corporation Seven

Execution of works for the development of working documentation and procurement of main technological equipment for the object “Title 16500 – Water intake from the Luga River with a water...

Read more

OOO China National Chemical Engineering Construction Corporation Seven

OOO China National Chemical Engineering Construction Corporation Seven

Complex of works for the development of working documentation and equipment procurement for the object “Title 16100 – Water treatment plants in the production infrastructure of the Gas Chemical Complex...

Read more

OOO Medvezhiy Ruchey

OOO Medvezhiy Ruchey

Complex of works for design, material and technical support, and “turnkey” construction of a mine wastewater treatment plant with a capacity of 2750 m3/h.

Read more

AO EuroChem Northwest-2

AO EuroChem Northwest-2

Execution of research and development design work for the development of conceptual solutions to bring the production area to “zero discharge” taking into account all prospective productions

Read more

AO IK ASE

AO IK ASE

Supply of a wastewater treatment plant for construction of the Energy Block No.1 of Kursk NPP-2

Read more

OOO Amur Gas Chemical Complex

OOO Amur Gas Chemical Complex

Development of project and working documentation, supply of equipment for the Water Treatment Plant and Rainwater Treatment Plant. Capacity of WTP – 3870 m3/h; Capacity of RWTP – 1347 m3/h

Read more

OOO Gipronickel Institute

OOO Gipronickel Institute

Execution of project documentation for the object PAO GMK Norilsk Nickel. Polar Division. Nadvoitsy Metallurgical Plant named after B.I. Kolesnikov. The 3rd smelting shop Block 5. Infrastructure objects. Smelter gas...

Read more

AO Apatit

AO Apatit

Main technical solutions for the reconstruction of CWT-1

Read more

AO Chelyabinsk Zinc Plant

AO Chelyabinsk Zinc Plant

Development of basic and detailed engineering documentation, supply of main technological equipment for the industrial stormwater and domestic wastewater treatment area, including installation and commissioning works and personnel training.

Read more

PAO NK Rosneft

PAO NK Rosneft

Supply of a container dewatering plant for AO RNPK (ONVSS) including installation and commissioning works

Read more

PAO GMK Norilsk Nickel

PAO GMK Norilsk Nickel

Performance of design and exploration work, manufacturing of a water treatment block-module installation with a capacity of 500 m3/h, and provision of installation supervision services (Dudinka)

Read more

PAO GMK Norilsk Nickel

PAO GMK Norilsk Nickel

Supply of vertical stock tank wastewater treatment plant with a capacity of 5 m3/day (Ergalaevsky)

Read more

AO EuroChem Northwest

AO EuroChem Northwest

Procurement of EDI modules

Read more

AO EuroChem Northwest

AO EuroChem Northwest

Complex of works for the design of the “Connection of the 4th EDI Block” object

Read more

OOO “Salavat Catalyst Plant”

OOO “Salavat Catalyst Plant”

Development of main technical solutions and initial data for assessing the economic efficiency of the project “Construction of treatment facilities for industrial wastewater at the Salavat Catalyst Plant”.

Read more

PAO NK Rosneft

PAO NK Rosneft

Project – Installation of mechanical and physical-chemical wastewater treatment for AO RNPK including installation and commissioning works.

Read more

OOO “IG “Phosphorite”

OOO “IG “Phosphorite”

Development of key technical solutions. Facility: Water and effluent treatment complex (WETC) at the industrial site of OOO “IG Phosphorit.”

Read more

2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Our customers

Thanks to the experience gained through project implementation and partnerships with companies worldwide, AO Ion Exchange Technologies is confidently able to handle projects of any complexity.

Licenses and certificates